On the date 22.10.2019 power was obtained by constructing a new 5 km 33 kV line from Razarhat, Togariat under the BPDB Power Distribution System Development Project, Rangpur. As a result of the improvement of transmission system in Kurigram, quality distribution system, etc., it is possible to ensure sustainable, safe and uninterrupted power supply.
Planning and Implementation: Cabinet Division, A2I, BCC, DoICT and BASIS